"C","ºÚÁÏÍø. Morning Report" "C","Filename: morning_report_20250208_20250208120006000.csv" "C","Report for 02/08/2025" "C","Report generated 03/14/2025 02:09:28 EDT" "H","Report Type","Status" "D","Morning Report","Final" "H","Section 1. Report Date","Report Time" "D","02/08/2025","00:00:00" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","02/07/2025","19","17002" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",28058 "D","B. Capacity Additions EcoMax Bid > CSO",1287 "D","C. Generation Outages and Reductions",2457 "D","D. Uncommitted Available Generation (Non-fast start)",9447 "D","E. DRR Capacity",180 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",-225 "D","NB",-211 "D","NYISO AC",-1600 "D","NYISO CSC",80 "D","NYISO NNC",-89 "D","Phase 2",-1760 "D","Net Deliveries",-3805 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",21414 "D","I. Peak Load Forecast For Hour Ending19",16550 "D","J. Total Operating Reserve Requirement",2736 "D","K. Capacity Required = I + J",19286 "D","L. Surplus = (+) Deficiency = (-) (H - K)",2128 "D","M. Replacement Reserve Requirement",180 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",1948 "D","Section 4. Largest First Contingency MW",1760 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",19796 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",2112 "D","Ten Minute Reserve Estimate:",2112 "D","Thirty Minute Reserve Requirement:",624 "D","Thirty Minute Reserve Estimate:",2752 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,0,-225 "D","NB",-1000,200,-211 "D","NYISO AC",-1600,1200,-1600 "D","NYISO CSC",-346,330,80 "D","NYISO NNC",-200,200,-89 "D","Phase 2",-2000,1200,-1760 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Cloudy","S-6",32 "D","Hartford","Cloudy","S-6",33 "H","Section 9. SAR Available","Value" "D","NYISO","Yes" "H","Section 10. Capacity of Non-Commercial Units" "D","Total Available",0 "H","Section 11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 12. Geomagnetic Disturbance Activity" "H","Description","Value" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","None" "D","Actions Taken or Planned by Other Control Areas:","None" "T","46 lines"